Commercial Waterproofing Melbourne

Waterproofing

Careful preparation and professionally applied membrane systems help protect wet areas, adjoining finishes and the wider building asset.

Protection Below The Surface

Waterproofing planned as part of the complete flooring system.

Successful waterproofing begins well before the finished tiles or floor covering are installed. The substrate, falls, junctions, penetrations and drainage points all need to be considered so the membrane can form a continuous protective layer.

Celtic Floors provides commercial wet-area waterproofing as part of an integrated flooring package. The team can coordinate substrate preparation, compatible primers and membranes, detailing at vulnerable transitions, and the flooring or tiling installed above.

Each project should be assessed against its drawings, product specifications and the applicable National Construction Code and Australian Standards. This page provides general service information; project-specific compliance requirements should be confirmed by the appointed builder, designer or certifier.

Our Approach

A systematic approach to wet-area protection.

The exact system varies by project, substrate and specification, but the fundamentals remain consistent.

01

Inspect

Review the substrate, falls, cracks, junctions, penetrations, wastes and surrounding construction.

02

Prepare

Clean and repair the surface, form required falls and apply the compatible primer or preparation system.

03

Detail

Treat corners, changes of plane, penetrations and water stops before completing the membrane field.

04

Protect

Apply the specified system, allow the required curing time and protect it before the finished flooring is installed.

Commercial Performance

Details that support a durable result.

Continuous protection

Compatible components are selected to create continuity across floors, walls, joints and penetrations.

Integrated installation

Waterproofing, preparation and finished flooring can be coordinated by one experienced team.

Commercial coordination

Work is planned around site access, other trades, curing periods and the project programme.

Careful detailing

Transitions, water stops, wastes and changes of plane receive particular attention.

System compatibility

Primers, membranes, adhesives and finishes are considered as parts of one assembly.

Project documentation

Specified products and installation stages can be recorded to suit project requirements.